Orem Drive – from MLK Blvd to East of Foxton Road

Terra Associates collaborated with Edminster, Hinshaw, Russ & Standley, Inc. to complete the design of Orem Drive, Phase 1C, from Martin Luther King Boulevard to 750 feet east of Foxton Road, which is located in Harris County Precinct (approximately 1.5 miles). The original design upgraded the street to a standard Harris County Boulevard Section. Due to environmental issues at the creek crossing, the project was delayed and upon recommencement, TAI revised previously completed construction drawings to alter the temporary ditch and outfall structure for HCFCD Unit C-120-00-00. Terra updated the construction drawings and project manuals to bring them to the current Harris County Engineering Department Standards and updated the sheets to remove a portion of the City of Houston’s sanitary sewer system.